Mori Building Co., Ltd., will pass on electrical power from the generation facilities in Roppongi Hills operated by Roppongi Energy Service Co., Ltd., a Mori Building subsidiary, to the Tokyo Electric Power Company (TEPCO) out of concern over the power supply shortage stemming from the Tohoku Region Earthquake.

Roppongi Hills is supplied with electrical power onsite from its own energy plant (a Roppongi Energy Service Co., Ltd. operated facility). The plant uses municipal gas as fuel and can therefore provide an extremely stable supply of power without being affected by electricity restrictions. Mori Building will provide electrical power to TEPCO, as power capacity is freed up through power saving measures taken at Roppongi Hills (Mori Building) and through the cooperation of corporate tenants and residents in saving electricity.

Details of Power Provision
Transmission Period: March 18 - April 30, 20111
Supply Hours: 24 hours per day
Power Supplied: 6:00 a.m. - 8:00 p.m.: 4,000 kW / 8 p.m. - 6:00 a.m.: 3,000 kW

(4,000 kW = power needed for about 1,100 standard homes)
1. The arrangement may continue from May 1 upon consultation with TEPCO.

110317_1.jpg

We would like to extend our deepest sympathy to the families of those who lost their lives in the Tohoku Region Earthquake and our sincere condolences to all those affected by this disaster.
We sincerely hope for a fast recovery in the afflicted area and will provide whatever humble support that we can as Mori Building Group.